This is the special vent trim that is needed for standing seam roofing. It is designed in such a way to vent air/moisture out of the roof and keep rain water out.
We needed to cut each piece to fit in between each standing seam.
I am placing window glazing between the roof and the vent trim to seal it from water.
The vent trim all in place.
Saturday, August 24, 2013
Wednesday, August 14, 2013
Installing the Windows for the Bathhouse
We are placing the side trim that will hold the window in place.
The windows are attached from the outside and are screwed into the wood trim. We will then stucco the outside of the building right up to the window edge.
All the windows are in place. It only took 2 hours to complete this part!
The windows are attached from the outside and are screwed into the wood trim. We will then stucco the outside of the building right up to the window edge.
All the windows are in place. It only took 2 hours to complete this part!
Friday, August 9, 2013
Subscribe to:
Posts (Atom)