So here we are finishing the drain even to the slab. Since we are going to stain the cement we will place the drain slightly lower than even with the floor, so that most of the water will be directed there. It is a little tricky because you have to cut and cement the PVC before the cement is poured into the patch hole. The easy way is to place a board across the hole and dry attach the parts before you cement them in. This worked quite well for us.
After the cement set we
ground the ruff edges with a grinder.
No comments:
Post a Comment