The crew worked yesterday and today building the forms to withstand the force of the wet cement . As we have learned in our past projects about how cement can get away from you if you don't have extremly strong forms and enough people to get the cement in place and smooth before it dries.
Above you can see the rebar in place about one foot apart going in both directions. We used 1/2 inch rebar, also known as #4 rebar.
After the fill dirt is in place and the footings are dug (footings are the ditches that go below the frost line around the whole building and where ever there will be a wall that needs extra support) ,6 mil plastic is placed as a vapor barrier so the cement does not dry out too fast. Next the rebar is cut and tied together to give the foundation its strength. In the picture above you can see one of the rebar structures ready to be placed in the footing.
Here we brought in our electical inside the building so we would not have to see the box on the outside. This line was dug a few years ago and we just extended it about 10 ft to come up from under the footing.
No comments:
Post a Comment