Sunday, April 12, 2015

Plumbing for the Bathhouse/Halfbath


Our original plans were to have a composting toilet in our buildings, so we had to cut through the slab for the Toilet flange and drain.



This is where the stub-out is connected to the plumbing brought through the floor.


This is were we connected the water line to the half bath to the  existing waterline we put in years ago. The larger pipe is the drain pipe for the kitchen and the bathhouse that is a grey water service.


Here it is all connected.....

No comments: