The first step is always to determine the out side perimeter. Because of the change in elevation we had to get more fill dirt.
Slowly the beams are determined and sacks full of dirt piled so the ditches don't cave in.
Stub-outs for the bathroom fixtures.
Re-bar for strength, 3/8" on the top, one foot apart and 1/2" in the ditches.
Next is the form for the porch.
All is ready for the pour......