Saturday, December 3, 2011

On to the Bathhouse.....

The windows are done and finished with cross boards to make sure they stay plum and square. We marked the top and inside of each frame.
We have been collecting the other materials for the bathhouse project as well: 7 yards of masonry sand, 15 bags of masonry cement, 15 bags of portland cement, 10 sticks of #3 rebar and Perlite for insulation to pour into the blocks. In my research I found out that this is the only material that can be used because loose fill fiber will absorb moisture .
Here Richard is using a square to make sure the corner remains square as he secures it with a screw. We are using treated 2X8 lumber for the windows.
We are using the shop slab that was poured 2 years ago for our work space, this is really coming in handy as it is level and cleaner than the dirt!

Here are my sketches that I drew up for the door and window openings. These have to be built before the first brick is laid for the building. I calculated the width of the door plus 1/2 inch for leaway . We decited to not have jams on these doors because of the final look. If you are planning on jams , you would add another inch and 1/2. The windows are the actual width plus 1/2 inch in all directions. It is important to note that the top piece rests on the side pieces for stuctual integraty .