Saturday, August 3, 2013

Roofing the bath house.

We have set out the roofing sheet in the order that they will be placed on the roof.
I am measuring the sheets to be cut, this is a very important step to get the roofing the right length, too long and the water will miss the gutters, too short and there could be leaks.
We have gathered the clips, screws and driver for securing down the sheets.
We pulled a string as a guide for where the roofing will end.
The clips are installed to anchor the seam down before we place the other sheet.
Each standing seam needs to be placed in position to lock it together with the previous panel.


The vent roof treatment here is a metal gasket piece which is glued down and screwed.
Finished!!!!

No comments: